Categorias: Concursos Públicos

Inglês – Tradução Livre 20/2013

TEXTO

Spending for
the 2014 World Cup in Brazil explodes beyond prediction and reaches R$ 26.5
billion

 

The cost for organizing the 2014 World Cup has now reached R$26.5
billion. The figure is R$2.7 billion higher than forecasted in the first
balance of Brazil’s budget, in January 2011, and will increase.

 

For the federal government, this account is not yet
closed. Asked by Folha, the Sports Ministry said the World Cup investment is
expected to reach R$33 billion.

 

Considered the current value – R$26.5 billion – the
country will finance 85.5% of the works related to the event. The money comes
from federal, state and municipal governments. The number is based on the
latest version of the responsibility matrix, consolidated in December 2012.

 

The document cites spending on works of urban
mobility, stadiums, ports, airports, telecommunications, security and tourism
related to the World Cup. Furthermore, it points out those responsible for
bearing the costs.

 

The figure has been updated with the price increase of
Maracana and with the values of the temporary installations around the arenas
of the Confederations Cup and the World Cup. To serve the two tournaments,
these structures will cost R$900 million to the hosts.

 

Of all the money that will be disbursed to hold the
World Cup, only R$3.8 billion will be funded by the private sector.

 

Another R$14.9 billion will be financed by the federal
government through loans or direct investment in the works. The remaining R$7.7
billion will come from the States and the host cities.

 

Most non-government investments will be made in
airports – R$3.64 billion will be invested in Guarulhos, Campinas, Brasília and
Natal.

 

With the exception of Natal, these terminals will be
operated by concessionaires. After construction, the investors will exploit
them commercially.

 

In the construction and renovation of stadiums, the
disparity is even greater. Direct investment from the private sector is
negligible.

 

In 2008, the year following the announcement that
Brazil would host the 2014 World Cup, then Sports Minister Orlando Silva Jr.
told Folha that not “a penny of public money” would be spent on World
Cup stadiums.

 

Asked about government spending, the Sports Ministry
argues that the World Cup is “a great opportunity for the government to
accelerate infrastructure works and perform major interventions for the
population.”

 

The ministry even states that spending on structure
and services cannot be considered “a specific cost of organizing the
event.”

 

The COL (Local Organizing Committee) had not responded
to questions from the reporter by the completion of this edition.

Fonte:
http://www1.folha.uol.com.br/internacional/en/sports/1227374-spending-for-the-2014-world-cup-in-brazil-explode-beyond-prediction-and-reach-r265-billion.shtml



Tradução Livre

Spending for
the 2014 World Cup in Brazil explodes beyond prediction and reaches R$ 26.5
billion

Gastos para Copa do Mundo
de 2014 no Brasil explodem além do previsto e alcançam 26,5 bilhões de reais

[beyond = além de, outro lado]

 

 

The cost for organizing the 2014 World Cup has now reached R$26.5
billion. The figure is R$2.7 billion higher than forecasted in the first
balance of Brazil’s budget, in January 2011, and will increase.

O custo
de organização da Copa do Mundo de 2014 tem agora alcançado 26,5 bilhões de
reais. O número (figure) é 2,7 bilhões mais alto do que o previsto (forecasted)
no primeiro balanço de orçamento do Brasil, em janeiro de 2011, e aumentará.

 

 

For the federal government, this account is not yet
closed. Asked by Folha, the Sports Ministry said the World Cup investment is
expected to reach R$33 billion.

Para o
governo federal, essa conta não está ainda fechada. Perguntado pela Folha, o
Ministério dos Esportes disse que o investimento da Copa do Mundo é esperado
para alcançar 33 bilhões de reais.

 

 

Considered the current value – R$26.5 billion – the
country will finance 85.5% of the works related to the event. The money comes
from federal, state and municipal governments. The number is based on the
latest version of the responsibility matrix, consolidated in December 2012.

Considerado
o valor corrente – 26,5 bilhões de reais – o país financiará (will finance)
85,5% dos trabalhos relacionados com o evento. O dinheiro vem dos governos
federal, estadual e municipal. O número é baseado sobre a última versão da
matriz de responsabilidade, consolidada em dezembro de 2012.

 

 

The document cites spending on works of urban
mobility, stadiums, ports, airports, telecommunications, security and tourism
related to the World Cup. Furthermore, it points out those responsible for
bearing the costs.

O
documento cita gastos sobre os trabalhos de mobilidade urbana, estádios,
portos, aeroportos, telecomunicações, segurança e turismo relacionados com a
Copa do Mundo. Além disso, ele aponta (point out) aqueles responsáveis por
suportarem (bear) os custos.

[Furthermore
= além disso]

 

 

The figure has been updated with the price increase of
Maracana and with the values of the temporary installations around the arenas
of the Confederations Cup and the World Cup. To serve the two tournaments,
these structures will cost R$900 million to the hosts.

O número
tem sido atualizado com o aumento de preço do Maracanã, e com os valores das
instalações temporárias em volta das arenas da Copa das Confederações e da Copa
do Mundo. Para servir aos dois torneios, essas estruturas custarão (will cost)
900 milhões de reais para os anfitriões.

 

 

Of all the money that will be disbursed to hold the
World Cup, only R$3.8 billion will be funded by the private sector.

De todo
o dinheiro que será desembolsado para hospedar a Copa do Mundo, somente 3,8
bilhões serão bancados (funded) pelo setor privado.

 

 

Another R$14.9 billion will be financed by the federal
government through loans or direct investment in the works. The remaining R$7.7
billion will come from the States and the host cities.

Outros
14,9 bilhões de reais serão (will be) financiados pelo governo federal por meio
de empréstimos ou investimentos direitos nos (in the) trabalhos. O remanescente
7,7 bilhões de reais virão (will come) dos estados e das cidades anfitriãs.

 

[through
= por meio de, através de]

 

 

Most non-government investments will be made in
airports – R$3.64 billion will be invested in Guarulhos, Campinas, Brasília and
Natal.

Muitos
dos investimentos não governamentais serão (will be) feitos nos aeroportos –
3,64 bilhões de reais serão (will be) investidos em Guarulhos, Campinas,
Brasília e Natal.

 

 

With the exception of Natal, these terminals will be
operated by concessionaires. After construction, the investors will exploit
them commercially.

Com a
exceção de Natal, esses terminais serão (will be) operados por
concessionários.  Após a construção, os
investidores explorar-los-ão (will exploit them) comercialmente.

 

 

In the construction and renovation of stadiums, the
disparity is even greater. Direct investment from the private sector is
negligible.

Na (in
the) construção e renovação dos estádios, a disparidade é ainda maior.

 

 

In 2008, the year following the announcement that
Brazil would host the 2014 World Cup, then Sports Minister Orlando Silva Jr.
told Folha that not “a penny of public money” would be spent on World
Cup stadiums.

Em 2008,
o ano seguinte ao anúncio de que o Brasil receberia (would host) a Copa do
Mundo de 2014, o então Ministro dos Esportes, Orlando Silva Júnior, disse para
a Folha que nenhum “centavo de dinheiro público” seria (would be) gasto sobre
os estádios da Copa do Mundo.

 

 

Asked about government spending, the Sports Ministry
argues that the World Cup is “a great opportunity for the government to
accelerate infrastructure works and perform major interventions for the population.”

Perguntado
sobre os gastos do governo, o Ministério dos Esportes argumenta que a Copa do
Mundo é “a grande oportunidade para o governo acelerar trabalhos de
infraestrutura e realizar os principais investimentos para a população”.

 

 

The ministry even states that spending on structure
and services cannot be considered “a specific cost of organizing the
event.”

O
ministério ainda declara (states) que os gastos sobre estrutura e serviços não
pode ser (cannot be) considerado “um custo específico da organização do
evento”.

 

 

The COL (Local Organizing Committee) had not responded
to questions from the reporter by the completion of this edition.

O COL (Comitê Organizador Local) não tinha respondido as perguntas
do repórter até o fechamento desta edição.

 

 

Adinoél Sebastião

Meu nome é ADINOÉL SEBASTIÃO. Sou formado em Ciências Contábeis pela Fundação Faculdade de Ciências Econômicas de Apucarana-PR (FECEA). Sou Auditor-Fiscal do Trabalho (AFT). Estou lotado em Brasília-DF na Secretaria de Inspeção do Trabalho em Brasília-DF. Fui aprovado no concurso de AFT-2013. Esse concurso, segundo o CESPE, teve 48.035. Fui Analista Tributário da Receita Federal (ATRFB) por mais de 22 anos (1991 a 2013). Sou autor do site "www.adinoel.com" e sou colaborador com traduções livres de Inglês e de Espanhol em alguns sites de concursos. Já atuei como professor e tutor online da ESAF (aulas de informática, palestras, funcionamento do CAC, etc). Elaborei/elaboro aulas de Espanhol, Inglês e Português para concursos. Possuo vários cursos de formação pessoal, entre eles destaco: curso de Espanhol no Instituto Cervantes da Espanha; curso de Inglês nas escolas FISK; curso online "Mejores Prácticas en la Administración Tributaria, Ed. 9", do Instituto de Estudios Fiscales e da Fundación CEDDET da Espanha.

Posts recentes

O que são as Emendas de Redação? São constitucionais?

Olá, tudo bem? Hoje responderemos ao questionamento sobre a constitucionalidade das emendas de redação e…

8 horas atrás

Transtorno de Personalidade Esquizotípica para Psicólogo PC-DF

Neste artigo você encontrará um resumo do Transtorno de Personalidade Esquizotípica, pertencente ao tópico de…

10 horas atrás

Funções Essenciais à Justiça para o STM

Olá, pessoal, tudo bem? As funções essenciais à justiça estarão em pauta hoje no nosso…

10 horas atrás

Concurso EBSERH: quais são os hospitais de lotação?

Confira quais são os hospitais de lotação! Iniciais de até R$ 17,9 mil! O edital…

12 horas atrás

Transtorno de Personalidade Evitativa para Psicólogo da PC-DF

Neste artigo você encontrará um resumo do Transtorno de Personalidade Evitativa, pertencente ao tópico de…

14 horas atrás

Controle de Constitucionalidade para o MPU

Olá, pessoal, tudo bem? Hoje vamos falar sobre controle de constitucionalidade. Dada a proximidade da…

14 horas atrás